What Is Included in SCADA and ACS Process Control Commissioning
- Installation of control cabinets, sensors, and field equipment: mounting per project documentation, cable routing, labelling, earthing;
- PLC and SCADA system configuration: programming of logic controllers, loading and debugging the SCADA application, testing all I/O channels;
- Testing in normal and emergency modes: verifying system response to abnormal conditions, sensor calibration, control algorithm verification;
- Integration into existing infrastructure: connection to operational data networks, upper-level SCADA, and dispatching systems;
- Documentation and site handover: as-built documentation, test reports, operating instructions for personnel, operator training.
Why Clients in Uzbekistan Choose SIGMA PRO for SCADA and ACS Commissioning
- 25+ years of experience and 50+ completed sites: from hydraulic structures and irrigation canals to industrial facilities and hotels across Uzbekistan;
- In-house engineering team: installation and commissioning are performed by SIGMA PRO's own engineers, not subcontractors — quality is controlled at every stage;
- Works without halting site operations: we perform installation and commissioning without interrupting water supply, production, or building operations;
- Full turnkey cycle: from design and equipment supply through commissioning and long-term ACS process control technical support.
Ready to order SCADA or ACS process control installation and commissioning in Tashkent or anywhere in Uzbekistan? Contact the SIGMA PRO team — we will calculate the cost and timeline for your site.
Frequently Asked Questions: SCADA Installation and Commissioning in Uzbekistan
What is commissioning and start-up (C&SU)?
C&SU is a comprehensive set of works to bring an installed automation system into operation: PLC and SCADA configuration, testing of all operating modes, sensor calibration, infrastructure integration, and documentation of results.
How long does commissioning take?
Timelines depend on system complexity. A small site (1–5 gates, basic SCADA) — 2 to 5 business days. A large distributed site (20+ gates, integration with a central dispatch point) — 2 to 6 weeks. All timelines are fixed in the contract.
Can commissioning be performed without halting production?
Yes. SIGMA PRO has extensive experience performing commissioning on operational hydraulic structures without interrupting water supply. Work is carried out in phases according to a schedule agreed with the client.