Installation and commissioning of equipment — SIGMA PRO Tashkent Commissioning of ICS and SCADA in Uzbekistan

What commissioning includes

  • Mounting of control cabinets, sensors and field equipment: installation according to design documentation, cable routing, labelling, grounding;
  • PLC and SCADA configuration: programming of logic controllers, loading and debugging of the SCADA application, testing of all input/output channels;
  • Testing in normal and emergency modes: verifying system response to abnormal situations, sensor calibration, validation of control algorithms;
  • Integration into existing infrastructure: connection to operating data networks, upper-level SCADA and dispatch systems;
  • Documentation and facility handover: as-built documentation, test reports, staff instructions, operator training.

Why choose SIGMA PRO for commissioning in Uzbekistan

  • 25+ years and 50+ completed projects: from hydro units and irrigation canals to industrial plants and hotels across Uzbekistan;
  • In-house engineering team: installation and commissioning are performed by SIGMA PRO's own specialists, not subcontractors — quality is controlled at every stage;
  • Work without shutting down the facility: we can perform installation and commissioning without interrupting water supply, production or building operation;
  • Full turnkey cycle: from design and equipment supply to commissioning and long-term technical support.

Ready to order installation and commissioning in Tashkent? Contact the SIGMA PRO team — we will calculate the cost and timeline for your facility.

FAQ about Installation and Commissioning of SCADA and ICS

What is commissioning (startup)?
Commissioning is the set of works that brings an installed automation system into operation: PLC and SCADA configuration, testing of all operating modes, sensor calibration, integration with the infrastructure and documentation of the results.
How long does commissioning take?
Timelines depend on system complexity. A small facility (1–5 gates, basic SCADA) takes 2 to 5 working days. A large distributed facility (20+ gates, integration with a central dispatch point) takes 2 to 6 weeks. Deadlines are fixed in the contract.
Can commissioning be done without stopping production?
Yes. SIGMA PRO has experience performing commissioning on operating hydraulic structures without interrupting the water supply. The work is carried out in stages according to a schedule agreed with the customer.